What the VdS 3103 guidance sheet means for battery energy storage systems, which additional codes property insurers rely on, and which evidence designers and operators should provide so that insurance cover holds in the event of a loss.
The guidance sheet VdS 3103 "Lithium Batteries" published by VdS Schadenverhütung is the German insurance industry's central publication on handling lithium batteries in production and storage areas. First published in 2012 and last revised in the 2019-06 edition, it consolidates findings from fire tests on the storage and staging of lithium batteries. Legally, VdS 3103 is neither a statute nor a technical rule introduced under building regulations — its effect operates under civil law through the insurance contract.
Many property insurers expressly incorporate the guidance sheet into their contract conditions or make compliance with it a policyholder obligation. If agreed safety provisions are breached, the insurer can reduce the payout under the rules of the German Insurance Contract Act or, in extreme cases, refuse it. For designers, installers and operators of stationary battery storage systems this means: the property insurer's expectations belong in the project's requirements profile from the very beginning — on an equal footing with building law and occupational safety.
Three Power Classes as an Organising Principle
VdS 3103 distinguishes lithium batteries of low, medium and high power — following the classification used in dangerous goods law. Medium-power batteries (above 100 Wh) must be stored separated or with sufficient distance (guide value: at least 5 m) from combustible materials. For high-power batteries, the guidance sheet requires fire compartmentation, monitoring of the storage area and individual coordination of the protection concept with the property insurer.
VdS 3103 was written for the storage and staging of batteries — a stationary battery energy storage system (BESS) in continuous operation goes beyond that. Underwriters therefore base their risk assessment on a bundle of further codes and evidence. In the German-speaking region, the Safety Guideline for Large-Scale Lithium-Ion Storage Systems published by the German Energy Storage Systems Association (BVES, 3rd edition, November 2025) has become the shared reference; contributors to its development included the GDV, VdS Schadenverhütung, the DGUV and the association of professional fire brigade chiefs (AGBF Bund).
At the core of every underwriting assessment is the question of whether a fire event remains confined to the affected unit. Since fire-fighting operations generally cannot prevent the total loss of a burning storage unit, structural separation determines the magnitude of the loss. The BVES guideline cites 5 to 10 m distance to other buildings and structures as orientation — always case-specific, and with the express advice to involve the property insurer as early as the design phase, because the insurer may impose further-reaching requirements.
Where distances cannot be achieved, thermal barriers take their place: non-combustible, solid partition walls — made of concrete elements or approved wall systems, for instance — extended at least 0.5 m above the top edge of the storage units and 0.5 m beyond each of their end faces. Alternatively or additionally, insurers and fire protection authorities accept large-scale fire tests where these demonstrate that fire spread from unit to unit is excluded or prevented for a sufficiently long time. For indoor installations, insurers expect fire-resistant partition walls of solid construction with tight- and self-closing closures, plus dedicated explosion relief openings to the open air.
Fire Simulation Is No Substitute for Testing
For large-scale lithium-ion storage, verification based solely on fire simulations is considered unsuitable, because the course of the fire depends heavily on cell type, cell chemistry, state of charge and system design. What carries weight are propagation tests and large-scale fire tests in combination with structural measures.
The more complete the evidence package, the faster and on better terms a storage project can be insured. It has proven effective to present the insurer with structured documentation that links technical test evidence, structural execution and organisational precautions.
Insurance cover is not a one-off commitment but is tied to ongoing compliance with the agreed safety provisions. These include the maintenance of the fire protection installations, keeping separation distances and explosion relief openings clear, continuous monitoring of cell parameters via the battery management system, and immediate notification of substantial changes — such as a capacity expansion, a cell change or structural interventions in partition walls and penetration seals.
It is advisable to document every recurring inspection and every repair in an audit-proof manner and to be able to present this to the insurer on request. Anyone who coordinates changes to the protection concept with the property insurer in advance avoids gaps in cover — and not infrequently benefits from better terms, because the risk is demonstrably under control.
Anton Brem
Managing Director
Refractory construction, high-temperature insulation and fire protection in industrial plants
Everything you need to know about VdS 3103 and Property Insurers' Expectations: The Evidence That Secures Insurance Cover
Your question not listed?
Request a personal consultationWhether complete relining, repair or emergency — free initial consultation and a fast response.